Call usWhatsAppRequest a quote

Overhead crane

Runs on the building’s runway beams to lift and move blocks and slabs across the hall.

Models 1

Overhead crane
To order, up to 50 t

Overhead crane

Runs on the building’s runway beams to lift and move blocks and slabs across the hall.

An overhead crane leaves the whole floor free because it travels above the hall on the building’s runway beams. We build single- and double-girder versions depending on load and span, with an Italian hoist trolley, control panel and remote.

Overhead crane

Send us the load and dimensions and we will reply with a quote.