Call usWhatsAppRequest a quote
Back to Cranes

Overhead crane

Runs on the building’s runway beams to lift and move blocks and slabs across the hall.

Capacity
To order, up to 50 t
Girders
Single or double girder
Control
Radio remote and pendant

An overhead crane leaves the whole floor free because it travels above the hall on the building’s runway beams. We build single- and double-girder versions depending on load and span, with an Italian hoist trolley, control panel and remote.

Photos

CapacityTo order, up to 50 t
GirdersSingle or double girder
ControlRadio remote and pendant

Send us the load, the dimensions and your plant location, and we will reply with a quote.